Date |
Work Description |
Contract Value Rs. in Million |
BSCPL Participation(%) |
26/02/2019 |
Construction of access controlled Nagpur - Mumbai super communication expressway (Maharashtra Samruddhi Mahamarg) in the state of Maharashtra on EPC mode for package 13, from KM. 577.739 to KM. 623.379 in (section - village Sonari to village Taranganpada) in district Nashik |
19905.30 |
51% |
31/08/2018 |
Construction of New Embankment Kuttighat-Bagdov Mahananda Left Embankment (46.02 KM), Nagar Right Embankment (20.10 KM), Kuttighat-Jhawa Manahanda Right Embankment (66.23 KM), Ratwa Left Embankment (32.92 KM) & Ratwa Right Embankment (33.10 KM) with 10 (Ten) Nos. A.F.S. & Brick on Edge Soling Over the Top of the Embankment under Mahananda Flood Management Scheme Phase-II |
4367.10 |
100% |
29/08/2018 |
Proposed New BG line between Kotipalli - Narsapur stations - Construction of Important Bridges Across River Vynatheya of 20 x 76.20 m clear span with Steel Through Girders and Vasishta of 17 x 76.20 m clear span with Steel Through Girders sub-structure on Double 'D' Well foundations and execution of protective and miscellaneous works (excluding execution of super-structure as Steel Through Girders) |
3202.40 |
51% |
04/07/2018 |
Provision of doubling of track between Vanchi Maniyanchchi and Nagercoil (Via Tirunelveli - Construction of Major bridges, Precast RCC box, Mechanical facilities and General Electrification works in Madurai & Thiruvananthapuram divions of Southern Railway |
2169.90 |
50% |
03/06/2018 |
Development of Infrastructure like laying Roads, Water supply & Sewer lines, Construction of Septic tank and Storm Water Drains in the Residential layout at Koheda (V), Hayathnagar(M), R.R. Dist |
297.80 |
100% |
21/03/2018 |
Raising and strengthening of Bagmati right embankment from k.m. 123.52 to k.m. 165.52 (hayaghat- karachin embankment from k.m. 0.00 to k.m. 42.00) and from k.m. 198.52 to k.m. 264.02 (k.b. embankment from 0.00 k.m. to 47.50 k.m. and b.n. embankment from 0.00 k.m. to 18.00 k.m.) and construction of dhala- 98 nos., turning plateform 107 nos. and anti flood sluice 17 nos. under Bagmati flood management scheme phase-iii(a) |
6006.50 |
100% |
13/03/2018 |
Widening and strengthening of Samarlakota – Rajanagaram road (sh148) to divided four lane from km 26.400 to km 56.400 in East Godavari district |
2929.00 |
25% |
15/02/2018 |
Construction of new embankment (left embankment 17 k.m. & right embankment 15 km) on river rato from no mans land to nisha road |
553.10 |
100% |
29/01/2018 |
Rehabilitation and up-gradation of Repalle to Eeppurpalem section from Km 129/927 to Km 195/000 of NH-214A (New NH-216) to two lanes with paved shoulder in the state of Andhra Pradesh under NHDP –IV through Engineering, Procurement & Construction (EPC) basis |
3867.90 |
100% |
06/12/2017 |
Infrastructure development works (Phase I) at AMTZ, Visakhapatnam |
3566.30 |
49% |
20/11/2017 |
Proposed flyovers / under passes at intersectionsconstruction of multi level flyovers/grade separatorsat 4 junctions LB Nagar & surrounding junctions” in Hyderabad under epc –turnkey |
3049.00 |
100% |
08/11/2017 |
Proposed New BG line between Kotipalli - Narsapur stations - Construction of Important Bridge Across River Gowthami with RCC column sub-structure on Double 'D' Well foundations and execution of protective and miscellaneous works (Excluding execution of super-structure as 44x76.20m clear span with Steel Through Girders) |
3468.80 |
51% |
08/11/2017 |
Construction of Flyover between Balanagar X Road to Narasapaur X Road ,Hyderabad under EPS basis |
686.70 |
100% |
18/08/2017 |
Construction of multilevel / grade separators at two junctions namely Owaisi hospital junction and Bahdurpura junction in Hyderabad under engineering procurement and construction (epc)-turnkey |
810.90 |
100% |
22/06/2017 |
Improvements, Formation & Metalling of Roads, Contruction of RCC Drains, Culverts & SW Drains in 13 Villages of Arkavathi Layout |
2341.70 |
100% |
14/06/2017 |
Four laning of Bakhtiyarpur – Mokama Section of NH-31 from km 153.300 to km 197.900 (Design Chainage) and (Existing Chainage km 153.300 to km 204.741 of NH – 31) in the State of Bihar on EPC Mode |
8370.90 |
100% |
01/04/2017 |
Resurfacing of runway and aircraft operating areas at AF stn Chandigarh |
4339.20 |
100% |
24/03/2017 |
Construction of N4 Road near Venkatapalem to Navuluru (Southern Boundary) Length 7.17Km and Construction N14 Road near Borupalem to Sakhamuru (Southern Boundary) Length 8.27 Km in AP New Capital, Amaravati |
2662.50 |
100% |
24/03/2017 |
Construction of E10 Road near Penumka to Inavolu (Western Boundary) (length of 7.814 Km), Construction of E14 Road near Mangalagiri to Neerukonda (Western Boundary) (length of 7.36 Km), and Construction of N16 Road Abbarajupalem to Nekkellu (Southern Boundary) (length of 8.776 Km) in AP New Capital City, Amaravati |
3379.80 |
100% |
15/03/2017 |
Four Laning of Hubli-Hospet section of NH-63 from Km.129.249 (Design Ch.129+249) to Km.267.000 (Design Ch.272+539) (143.29 total length) in the State of Karnataka under NHDP Phase-IV-B |
13347.00 |
50% |